Moving into Load of Fun Space

From Baltimore Node Wiki
Revision as of 16:02, 5 August 2009 by Abachman (talk | contribs)
Jump to navigationJump to search

Who is heading this up? Abachman 16:02, 5 August 2009 (UTC)

From Opening the Door to the First Workshop

Prepping the Space

  • Remove wallpaper
  • Remove curtains and felt (carefully, if Sherwin wants these back)
    • We must keep the curtains until suitable replacement window covering / obscuring can be obtained or it's agreed by the whole membership that we want everything to be seen all the time. Abachman 15:51, 5 August 2009 (UTC)
  • Treat moldy areas of drywall with Borax
  • Patch any holes, dents, etc. in the drywall
  • Paint moldy areas with Killz
  • Paint walls ~white
  • Sweep
  • Mop
  • Clean up

Materials needed for Prepping

  • Scraper tools for removing wallpaper
  • 10ft+ ladder(s)
  • Borax
  • Spray bottle(s)
  • Fast drying joint compound
  • Spreader(s)
  • Sandpaper
  • 1+ gallon of Killz
  • Paintbrushes
  • Roller heads
  • Roller mechanisms
  • Roller poles, preferably telescoping
  • 8+ gallons of ~white paint (please check my math on the quantity of paint)
  • Paint trays
  • Paint tray inserts
  • Broom(s)
  • Mop(s)
  • Trash bags